skip to page content
Overland Park
Kansas
OP Convention Center
City of Overland Park - www.opkansas.org

Preliminary Engineering Studies

All of the following links are Adobe Acrobat PDF files.

2007 Preliminary Engineering Study

2007 Preliminary Engineering Plans (3.97MB)

Quivira Road (167th to 179th streets)

175th Street (179th Street to Quivira Road)

135th Street and U.S. 69 Interchange

143rd Street (Pflumm Road to Metcalf Avenue)

151st Street (Quivira Road to Antioch Road) - Construction Complete
Quivira Road (151st Street to 159th Street)
Switzer Road (151st Street to 159th Street)

159th Street (Pflumm Road to Antioch Road)

159th Street (Nall Avenue to Kenneth Road)
Mission Road (159th Street south to Blue River)

Antioch Road (167th Street to 179th Street)

2003 Preliminary Engineering Study

2003 Preliminary Engineering Plan, Volume 1

2003 Preliminary Engineering Plan, Volume 2

159th Street at Pflumm

167th Street (Pflumm to Quivira)

167th Street (Quivira to Switzer)

167th Street (Switzer to Antioch)

167th Street (Antioch to Metcalf)

Antioch Road (159th Street to 167th Street)

Metcalf Avenue at 167th Street

Pflumm Road (159th Street to 167th Street)

Pflumm Road (167th Street to 175th Street)

Quivira Road (159th Street to 167th Street)

Switzer Road (159th Street to 167th Street)

US 69 northbound ramp at 167th Street

US 69 southbound ramp at 167th Street