OP Cares

Do you have questions about Overland Park but can't find answers? Let us assist you with any questions or concerns that you have about Overland Park.
» Submit Ticket

Preliminary Engineering Studies

Print    Text Size

For more information,
call 913-895-6040

The city uses preliminary engineering studies for future development of the thoroughfare systems.

Developers, utility companies and other agencies use the studies as a means of aligning future development with road system improvements.

Preliminary Engineering Studies
Roadway Corridor

Study

Plans

Cross
Section

135th Street and U.S. 69 Interchange

143rd Street (Pflumm Road to Metcalf Avenue)
159th Street (Nall Avenue to Kenneth Road)
159th Street (Pflumm Road to Antioch Road)
159th Street and Pflumm Road Intersection
167th Street (Antioch to Metcalf)  
167th Street (Pflumm to Metcalf)
167th Street (Pflumn to Quivira)  
167th Street (Quivira to Switzer)  
167th Street (Switzer to Antioch)  
167th Street and Metcalf Intersection
175th Street (179th Street to Quivira Road)
Antioch Road (167th Street to 179th Street)
Mission Road (159th Street south to Blue River)
Pflumn Road (159th Street to 167th Street)  
Pflumn Road (159th Street to 175th Street)
Quivira Road (151st Street to 159th Street)
Quivira Road (159th Street to 167th Street)
Quivira Road (167th to 179th Streets)
Switzer Road (151st Street to 159th Street)
Switzer Road (159th Street to 167th Street)
US 69 and 167th Street (northbound ramp)
US 69 and 167th Street (southbound ramp)